Harbour Shores Construction Update — March 2026

Construction at Harbour Shores in Biggera Waters, Gold Coast is progressing strongly across all stages, with significant milestones reached throughout the precinct in March 2026. Watch the full construction update video above to see the latest progress across the development.

Harbour Shores March Construction Update 2026 Lewis Land

The Waterline

The Waterline is nearing completion, with the building advancing inside and out. Rooftop palms are now in place, and trades are active on all levels completing final joinery, installing electrical fixtures, tiling, and painting. A limited number of 3 bedroom apartments remain available, with the first residents expected to move in later this year.


The Residences

The six luxury waterfront villas that make up The Residences are well into fit-out. All in-ground services are installed, internal sheeting is complete, and pool tiling is underway. Part of the exclusive Signature Collection, The Residences are a limited release of double-storey waterfront homes with private marina berths.


Palm House

Palm House is rising steadily, with the Level 2 concrete slab now poured. Facade works and interior fit-out will follow over the coming months. 2 and 3 bedroom apartments are currently available from $1,050,000.


Marina Berths & Amenity

Across the broader precinct, the marina and amenity works are now clearly visible from the waterfront. Construction of the private marina — set to offer 70 berths for residents — is well underway, alongside the waterfront boardwalk structure. Works have also commenced on The Clubhouse, lagoon-style pool, and gym facilities. Learn more about the lifestyle and amenity at Harbour Shores.


About Harbour Shores

Harbour Shores is a masterplanned waterfront community at 528–564 Oxley Drive, Biggera Waters QLD 4216, developed by Lewis Land Group. The development holds a 6 Star Green Star rating, is fossil fuel-free, and dedicates more than 54% of the site to open space. Read more about our commitment to sustainability.

For more information, visit the Harbour Shores Sales Display at Harbour Town Shopping Centre, open 9am–5pm, 7 days, or call 1800 870 554. Stay up to date with ongoing construction updates on Instagram @harbourshores_goldcoast or browse our latest news and updates.

Harbour Shores Named a Top 10 Finalist for Excellence in Sustainability in the 2026 Urban Developer Awards

Harbour Shores, the waterfront master-planned community in Biggera Waters developed by Lewis Land Group, has been named one of just ten finalists nationally in the Excellence in Sustainability category at The Urban Developer Awards for Industry Excellence 2026 — one of Australia’s most prestigious and independent property industry awards. 

Harbour Shores is the only Gold Coast project to make the shortlist in this category. 

Read More
Harbour Shores March Construction Update 2026 Lewis Land

Harbour Shores Construction Update — March 2026

Construction at Harbour Shores in Biggera Waters, Gold Coast is progressing strongly across all stages, with significant milestones reached throughout the precinct in March 2026. Watch the full construction update video above to see the latest progress across the development.

Read More

Harbour Shores Named Silver Winner at the BETTER FUTURE World Design Awards 2026

Harbour Shores has been recognised on the world stage, taking home a Silver Award at the 2026 BETTER FUTURE World Design Awards in the category of NEXT Futures: Environmental Sustainability.

Read More